District Cooling

Petrokima Engineering & Contracting

- The First and Largest Central Cooling Plant for The New Administrative Capital, The Project Involves Construction of The First District Cooling Plant of Capacity 60,000 Tons of Refrigeration (TR) For The Governmental And Financial Districts. Providing  Up 20% Power Saving, Due To The Implementation of New Power & Load  Equations & Machines Load Curves in The Programming SW.

- The Project Will Contribute to Rationalizing Energy Consumption and Provide Alternatives to The Traditional Electricity Cooling Method.

- Automation System Design , Implementation based on Latest Siemens Technology HW & SW Including:

  •  Complete PLC & SCADA Programming ,Implementation, Testing for Siemens PLC S7-1500H Redundant System – 1st System in Egypt - As A Central Unit & ET-200S for Signal Modules.
  •  Number of Physical  I/O 5000 Signal , 1000 Signal Via Communication
  •   SCADA Monitoring System Consist of Latest Wincc v7.5 ,SCADA Workstations Consists of Large Video Wall ,
  • One Redundant Server, One Historian Server &Three Client Stations.
  •    QTY 149 PLC Panel (1 Central Panel ,133 ETS Energy Transfer System, 16 Remote Panel).
  •   QTY 15 HMI for Remote Areas.
  •   Ethernet Network, , Fiber Optic Network For Remote Areas, Third Party Communication via Modbus Serial & TCP/IP
  •   Control Panel Design Using Latest Eplan Version 2.8 
  •   Panels  Assembly, Testing & FAT, Site Activity